Show on map
Meridian — Power plant · Oil · Tennessee Valley Authority
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oil Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1998
Net generation, 2025
0 MWh
Grid
500 kV to Tennessee Valley Authority (TVA)
Location
Lauderdale County, Mississippi
Operated by
Tennessee Valley AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2025
Fuel burned MMBtu by year, 2003 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
28 years since 1998
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
500
Transmission owner
Tennessee Valley Authority
Balancing authority code
TVA
Balancing authority name
Tennessee Valley Authority
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeTVA
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source