Show on map
Merrimack 230 kV line — Transmission lineCONSOLIDATED COMMUNICATIONS - DATA CENTER MANCHESTER — Built · Large load · NH · 7.1 mi awayHEALTH DIALOG BEDFORD DATACENTER — Built · Large load · NH · 8.6 mi awayFIRSTLIGHT FIBER INC. BEDFORD — Built · Large load · NH · 10.7 mi away
  • Loads
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Merrimack 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NH
Owner (as stated)
Public Service Of New Hampshire

Details

Who’s behind it

Owner
Public Service Of New Hampshire

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
8
Substations at the ends (as the source names them)
Merrimack
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpublic service of new hampshire
HIFLD line ID127982
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CONSOLIDATED COMMUNICATIONS - DATA CENTER MANCHESTER Built Large load 7.1 mi
HEALTH DIALOG BEDFORD DATACENTER Built Large load 8.6 mi
FIRSTLIGHT FIBER INC. BEDFORD Built Large load 10.7 mi

Sources EPA ICIS-Air

Sources

Attribution