MESA 1 — Power plant · Storage · PUD No 1 of Snohomish County - (WA)
  • Storage
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Storage

As filed: MESA 1

Key facts

Power plant · Storage Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2015
Net generation, 2024
-4 MWh
Grid
13 kV to PUD 1 of Snohomish County (BPAT)
Location
Snohomish County, Washington
Operated by
PUD No 1 of Snohomish County - (WA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
11 years since 2015
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-2
Balancing authority codeBPAT
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -2.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
August 2025
Capacity retired
2 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
ABatteries1 MWRetiredAugust 2025
BBatteries1 MWRetiredAugust 2025

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
13 kV
Transmission or distribution system owner
PUD 1 of Snohomish County
Balancing authority
Bonneville Power Administration
NERC region
WECC
Transmission lines within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units A, B scheduled to retire, 2 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source