Show on map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Size not stated
- Other infrastructure
Mesa: route and 13 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Mesa
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-TX
- Operated by
- Plains All American PipelineSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 79
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | PLAINS ALL AMERICAN PIPELINE |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Mesa |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Wallie Storage Postponed | Storage | 0.3 km | 200 |
| Dolce BESS, LLC Studied | Storage | 2.1 km | 100.7 |
| Bhalu Studied | Storage | 4.0 km | 205.5 |
| BARBER LAKE DATA CENTER PROJECT Under construction | Large load | 10.6 km | |
| Hackberry Creek Solar Contracted | Solar | 12.5 km | 175.5 |
| Flatland Solar Filed | Solar | 14.4 km | 180 |
| FGE Texas I Postponed | Gas, combined cycle | 15.5 km | 743 |
| FGE Texas II Postponed | Gas, combined cycle | 15.6 km | 743 |
| GBG SOLAR Under construction | Solar | 16.4 km | 22.2 |
| Morgan Creek Postponed | Coal | 16.7 km | 800 |
| Jayhawk Postponed | Solar | 23.1 km | 101 |
| Knapp BESS Under construction | Storage | 24.5 km | 10 |
| Champaign BESS, LLC Contracted | Storage | 24.9 km | 201.1 |