Show on map
- Wind & solar
- In development
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- In development
- Operating
Mesteno: location and 3 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Mesteno
Power plant · Wind
Key facts
Power plant · Windran 35% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2019
- Net generation, 2025
- 609,873 MWh
- Grid
- 345 kV to Electric Transmission Texas LLC (ERCO)
- Location
- Starr County, Texas
- Operated by
- Deriva Energy
Output
Details
Who’s behind it
- Owner
- Mesteno Wind
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Wind source: “Onshore Wind Turbine”
- Age
- 7 years since 2019
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 2,080,887 |
| Capacity factor, 2025 | 0.345 |
| Net generation (MWh), 2025 | 609,873 |
| Balancing authority code | ERCO |
Wind turbines
- Turbines
- 56
- Turbine capacity (MW)
- 201.6
- Turbine models
- 56 Vestas V136-3.6
- Hub height (m)
- 112
- Rotor diameter (m)
- 136
- Year online
- 2019
Source U.S. Wind Turbine Database
Source
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Deriva Energy | Operator | EIA-860M | ||
| Mesteno Wind | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Wind Turbine DatabaseMap services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Diamondback Solar Contracted | Solar | 7.2 mi | 200.5 |
| Kobernat Solar and Storage Postponed | Solar + storage | 11.9 mi | 152 |
| Rising Star Solar Permitted | Solar | 12.7 mi | 500 |