Show on map
Mesteno — Power plant · Wind · Deriva EnergyDiamondback Solar — Contracted · Solar · TX · 200.5 MW · 7.2 mi awayKobernat Solar and Storage — Postponed · Solar + storage · TX · 152 MW · 11.9 mi awayRising Star Solar — Permitted · Solar · TX · 500 MW · 12.7 mi away
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Wind

Key facts

Power plant · Windran 35% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
609,873 MWh
Grid
345 kV to Electric Transmission Texas LLC (ERCO)
Location
Starr County, Texas
Operated by
Deriva Energy

Output

Net generation MWh by year, 2019 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
7 years since 2019
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000910001
Location id
L100000907419
Eia plant ids
62258
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
345
Transmission owner
Electric Transmission Texas LLC
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20252,080,887
Capacity factor, 20250.345
Net generation (MWh), 2025609,873
Balancing authority codeERCO

Wind turbines

Turbines
56
Turbine capacity (MW)
201.6
Turbine models
56 Vestas V136-3.6
Hub height (m)
112
Rotor diameter (m)
136
Year online
2019

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Deriva Energy Operator EIA-860M
Mesteno Wind Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Diamondback Solar Contracted Solar 7.2 mi 200.5
Kobernat Solar and Storage Postponed Solar + storage 11.9 mi 152
Rising Star Solar Permitted Solar 12.7 mi 500

Sources ERCOT · EIA-860M

Sources

  • ERCOTOpen license · retrieved Nov 4, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution