Middleton Airport Solar — Power plant · Solar · Madison Gas & Electric CoPine Hill Solar — Under construction · Solar · WI · 6 MW · 6.5 mi awayUW Madison Charter Street Plant — Postponed · Biomass · WI · 22 MW · 7.4 mi awayVienna Walbec Customer Hosted — Under construction · Solar · WI · 1.4 MW · 8.9 mi awaySunnyside Solar Energy Center — Under construction · Solar + storage · WI · 60 MW · 10.3 mi awayNine Springs Solar — Under construction · Solar · WI · 8 MW · 10.4 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Middleton Airport Solar

Power plant · Solar

Key facts

Power plant · Solarran 15% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
7,430 MWh
Grid
14 kV to Madison Gas & Electric Co (MISO)
Location
Dane County, Wisconsin
Operated by
Madison Gas & Electric CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2020 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000816746
Location id
L100000813994
Eia plant ids
62731
Grid
Nerc region
MRO
Report year
2025
Grid voltage kv
13.80
Transmission owner
Madison Gas & Electric Co
Balancing authority code
MISO
Balancing authority name
Midcontinent Independent Transmission System Operator, Inc..
Fuel burned (MMBtu), 202525,353
Capacity factor, 20250.151
Net generation (MWh), 20257,430
Balancing authority codeMISO

Solar arrays

Array area (acres)
17.1
AC capacity (MW)
5
DC capacity (MW)
6.3
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2020

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pine Hill Solar Under construction Solar 6.5 mi 6
UW Madison Charter Street Plant Postponed Biomass 7.4 mi 22
Vienna Walbec Customer Hosted Under construction Solar 8.9 mi 1.4
Sunnyside Solar Energy Center Under construction Solar + storage 10.3 mi 60
Nine Springs Solar Under construction Solar 10.4 mi 8

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution