Show on map
Milan — Power plant · Gas, reciprocating engine · MILAN ENERGY LLCMilan — Postponed · Gas, reciprocating engine · PA · 22 MW · 0.0 mi awayBradford Solar PA — Filed · Solar · PA · 100.5 MW · 12.2 mi awayHollenback Farm Data Center Buildings — Filed · Large load · PA · 12.5 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 23% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2017
Net generation, 2025
41,422 MWh
Grid
34 kV to Pennsylvania Electric Co (PJM)
Location
Bradford County, Pennsylvania
Operated by
Milan Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2017 to 2025
Fuel burned MMBtu by year, 2017 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Owner
Milan Energy LLCSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of Dec 31, 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
9 years since 2017
Unused energy
143 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,584 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Pennsylvania Electric Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110070262431
Subparts reported
C
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1013039
Fuel burned (MMBtu), 2025397,011
Capacity factor, 20250.225
Heat rate (Btu/kWh), 20259,584.5
Net generation (MWh), 202541,422
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Milan Postponed Gas, reciprocating engine 0.0 mi 22
Bradford Solar PA Filed Solar 12.2 mi 100.5
Hollenback Farm Data Center Buildings Filed Large load 12.5 mi

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 9, 2026

Attribution