- Clean firm
- Operating
- 10 · 100 · 1,000 MW
Map
- Clean firm
- Operating
Mile 28 Water Power Project: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Mile 28 Water Power Project
Power plant · Hydro
Key facts
Power plant · Hydroran 41% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1994
- Net generation, 2025
- 4,986 MWh
- Grid
- 34 kV to Idaho Power Co (IPCO)
- Location
- Jerome County, Idaho
- Operated by
- Wood Hydro, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 4,986
MWh - Fuel burned, 2025
- 17,012
MMBtu - Capacity factor, 2025
- 40.7
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 4,986 | 17,012 | 40.7% | — |
| 2024 | 5,300 | 18,085 | 43.1% | — |
| 2023 | 3,681 | 12,559 | 30.0% | — |
| 2022 | 4,858 | 16,575 | 39.6% | — |
| 2021 | 5,388 | 47,653 | 43.9% | — |
| 2020 | 7,628 | 66,873 | 62.0% | — |
| 2019 | 898 | 7,996 | 7.3% | — |
| 2018 | 4,098 | 37,308 | 33.4% | — |
| 2017 | 6,043 | 55,673 | 49.3% | — |
| 2016 | 4,625 | 42,698 | 37.6% | — |
| 2015 | 4,766 | 44,414 | 38.9% | — |
| 2014 | 4,755 | 45,221 | 38.8% | — |
| 2013 | 4,044 | 38,585 | 33.0% | — |
| 2012 | 4,936 | 46,970 | 40.1% | — |
| 2011 | 5,022 | 48,796 | 40.9% | — |
| 2010 | 4,508 | 43,981 | 36.8% | — |
| 2009 | 4,371 | 42,662 | 35.6% | — |
| 2008 | 3,382 | 33,325 | 27.5% | — |
| 2007 | 3,676 | 36,334 | 30.0% | — |
| 2006 | 3,026 | 30,015 | 24.7% | — |
| 2005 | 3,945 | 39,446 | 32.2% | — |
| 2004 | 3,026 | 30,327 | 24.6% | — |
| 2003 | 3,800 | 38,916 | 31.0% | — |
| 2002 | 3,826 | 38,922 | 31.2% | — |
| 2001 | 262 | 2,707 | 2.1% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.