Milhurst Solar - Smithburg 230 kV
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Milhurst Solar - Smithburg 230 kV: route and 10 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Milhurst Solar - Smithburg 230 kV
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 230 kV
- States crossed
- US-NJ
- Owner (as stated)
- Jersey Central Power Light
Details
Who’s behind it
- Owner
- Jersey Central Power Light
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Mapped route length (miles)
- 4
- Substations at the ends (as the source names them)
- Milhurst Solar to Smithburg
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | jersey central power light |
| HIFLD line ID | 125759 |
| Voltage class | 220-287 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Millstone Solar One Postponed | Solar | 1.9 mi | 2.8 |
| East Windsor Solar 1 LLC Permitted | Solar | 6.4 mi | 1.4 |
| QTS INVESTMENTS PROPERTIES PRINCETON LLC Built | Large load | 8.9 mi | |
| MCGRAW HILL INC Built | Large load | 9.2 mi | |
| BLOOMBERG DATA CENTER Built | Large load | 10.9 mi | |
| Gateway Energy Center, LLC Postponed | Gas, combined cycle | 13.0 mi | 440 |
| Middlesex Energy Center LLC Postponed | Gas, combined cycle | 13.2 mi | 570 |
| PROPOSED DATA CENTER DEVELOPMENT Under construction | Large load | 13.8 mi | |
| Milltown Onsite BESS Under construction | Battery storage | 13.9 mi | 13.2 |
| NAEA Ocean Peaking Power LLC Postponed | Gas, combustion turbine | 14.0 mi | 191.5 |
Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES