Show on map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Loads
- In development
- Under construction
- Stage not stated
- Size not stated
- Other infrastructure
Millenium: route and 16 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Millenium
Crude oil pipeline
Key facts
Crude oil pipeline Operating- Mapped route length
- Mapped route length: sourceEIA Energy Atlas · Open licensemiles
- States crossed
- US-TX
- Operated by
- SunocoSourceEIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 189
- Units
- 1
All 5 attributes from EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
| Attribute | Value |
|---|---|
| Mapped parts | 1 |
| Operator, as the source states it | SUNOCO |
| Mapped segments | 1 |
| Source release | 202001 |
| Pipeline name raw | Millenium |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Sources
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)Source: U.S. Energy Information Administration, U.S. Energy Atlas, Crude Oil Pipelines (as of January 2020)
- EIA US Energy Atlas — Crude Oil Pipelines (line geometries, operator, pipeline name)
Around this pipeline
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Amelia Energy Center Postponed | Gas, combined cycle | 0.4 km | 900 |
| Banita Creek- Spindlepop Solar Under construction | Solar + storage | 1.2 km | 673.9 |
| Pinecrest Energy Center Postponed | Gas, combined cycle | 2.4 km | 753 |
| Sun Angel ESS Studied | Storage | 4.4 km | 201.5 |
| Nacogdoches Power Postponed | Gas, combined cycle | 5.4 km | 925 |
| Longwing Solar Postponed | Solar | 6.9 km | 140 |
| Peri Peri Solar Postponed | Solar | 7.1 km | 115 |
| ELLIOTT ELECTRIC STORE AND DATA CENTER Unknown | Large load | 11.8 km | |
| Lumberton PV I, LLC Announced | Solar | 11.8 km | 200 |
| Legend Power Station Studied | Gas, other | 12.1 km | 820 |
| Orange County Advanced Power Station Under construction | Gas, combined cycle | 13.6 km | 1,306 |
| Trinity River Solar 1 × 2 units Filed | Solar | 18.4 km | 225 |
| Segno Solar Station Announced | Solar | 18.5 km | 170 |
| Votaw Solar Station Announced | Solar | 21.3 km | 141 |
| Martin Lake Postponed | Coal | 24.9 km | 800 |
Sources EIA-860M · ERCOT · EPA ICIS-NPDES · Berkeley Lab
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- ERCOT GIS Report (Generator Interconnection Status)
- EPA ECHO ICIS-NPDES construction stormwater coverage (data-centre sites, national)
- LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.