Millstone — Power plant · Nuclear · Dominion Energy Nuclear Conn Inc
  • Clean firm
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Nuclear

Key facts

Power plant · Nuclearran 84% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1975
Net generation, 2025
16,708,717 MWh
Grid
345 kV to NSTAR Electric Company (ISNE)
Location
New London County, Connecticut

Operations

Net generation, 2025
16,708,717MWh
Fuel burned, 2025
174,495,593MMBtu
Capacity factor, 2025
84.4%
Heat rate, 2025
10,443Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
2026 (8 of 12 months)11,214,890117,117,098—10,443
202516,708,717174,495,59384.4%10,443
202416,870,305176,169,87885.0%10,443
202313,669,458142,873,97969.0%10,452
202216,464,167172,011,34383.2%10,448
202117,216,509179,552,91787.0%10,429
202015,714,855164,157,03479.2%10,446
201916,733,398174,724,15684.5%10,442
201816,881,492176,490,06785.3%10,455
201716,499,621172,571,64283.4%10,459
201616,575,492173,354,88783.5%10,458
201517,410,917182,092,03587.9%10,458
201415,840,619165,678,79480.0%10,459
201317,079,582178,460,09486.3%10,449
201217,077,887178,952,23086.0%10,479
201115,927,837166,668,88680.5%10,464
201016,750,304175,074,17884.6%10,452
200916,657,382174,702,62084.1%10,488
200815,432,946161,860,73777.7%10,488
200716,386,142171,808,70282.8%10,485
200616,589,446173,094,27683.8%10,434
200515,562,122162,390,74378.6%10,435
200416,539,097172,453,16483.3%10,427
200316,078,095167,549,82881.2%10,421
200214,918,272155,776,59775.4%10,442
200115,427,767161,096,74477.9%10,442
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.