Minot Wind Project — Power plant · Wind · Basin Electric Power Coop
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Minot Wind Project

Power plant · Wind

Key facts

Power plant · Wind Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2025
0 MWh
Grid
69 kV to Basin Electric Power Coop (SWPP)
Location
Ward County, North Dakota
Operated by
Basin Electric Power CoopSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
17 years since 2009
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019672, G100001022698
Location id
L100001017683
Eia plant ids
55995
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeSWPP
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Wind turbines

Turbines
3
Turbine capacity (MW)
4.5
Turbine models
2 GE Wind GE1.5-77 and 1 GE Wind GE1.5-82.5
Hub height (m)
80
Rotor diameter (m)
77–82.5
Year online
2009

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
2.6 MW
Generators retired
1
Capacity still in service
4.5 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
MWPOnshore Wind Turbine2.6 MWRetiredMarch 2022

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Basin Electric Power Coop
Balancing authority
Southwest Power Pool
NERC region
MRO
Transmission lines within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit MWP scheduled to retire, 2.6 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 9, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory