Show on map
Mira Loma Peaker — Power plant · Gas, combustion turbine · Southern California Edison CoRoadhouse Energy Center — Contracted · Storage · CA · 300 MW · 0.5 mi awaySolar Photovoltaic Project #08 — Postponed · Solar · CA · 0.5 MW · 2.5 mi awaySolar Photovoltaic Project #12 — Postponed · Solar · CA · 0.5 MW · 2.6 mi awaySolar Photovoltaic Project #09 — Postponed · Solar · CA · 0.5 MW · 2.7 mi awaySolar Photovoltaic Project #21 — Postponed · Solar · CA · 2.5 MW · 4.9 mi awaySolar Photovoltaic Project #04 — Postponed · Solar · CA · 1.5 MW · 5.1 mi awaySolar Photovoltaic Project #14 — Postponed · Solar · CA · 1.5 MW · 5.3 mi awaySolar Photovoltaic Project #10 — Postponed · Solar · CA · 0.5 MW · 5.4 mi awaySolar Photovoltaic Project #31 — Postponed · Solar · CA · 1 MW · 5.6 mi awaySolar Photovoltaic Project #17 — Postponed · Solar · CA · 0.5 MW · 5.7 mi awaySolar Photovoltaic Project #23 — Postponed · Solar · CA · 0.5 MW · 5.7 mi awaySolar Photovoltaic Project #18 — Postponed · Solar · CA · 0.5 MW · 6.0 mi awaySolar Photovoltaic Project #19 — Postponed · Solar · CA · 5 MW · 6.2 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 8.7 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 10.3 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 11.0 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 11.0 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 11.7 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 11.8 mi away
  • Combustion
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Mira Loma Peaker

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2007
Net generation, 2025
1,052 MWh
Grid
66 kV to Southern California Edison Co (CISO)
Location
San Bernardino County, California

Output

Net generation MWh by year, 2007 to 2025
Fuel burned MMBtu by year, 2007 to 2025
  • Gas

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
19 years since 2007
Unused energy
435 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
15,204 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
66
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110030489059
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000516
Fuel burned (MMBtu), 202515,995
Capacity factor, 20250.002
Heat rate (Btu/kWh), 202515,204.4
Net generation (MWh), 20251,052
Balancing authority codeCISO

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Southern California Edison Co Operator EIA-860M
EDISON INTERNATIONAL Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Roadhouse Energy Center Contracted Storage 0.5 mi 300
Solar Photovoltaic Project #08 Postponed Solar 2.5 mi 0.5
Solar Photovoltaic Project #12 Postponed Solar 2.6 mi 0.5
Solar Photovoltaic Project #09 Postponed Solar 2.7 mi 0.5
Solar Photovoltaic Project #21 Postponed Solar 4.9 mi 2.5
Solar Photovoltaic Project #04 Postponed Solar 5.1 mi 1.5
Solar Photovoltaic Project #14 Postponed Solar 5.3 mi 1.5
Solar Photovoltaic Project #10 Postponed Solar 5.4 mi 0.5
Solar Photovoltaic Project #31 Postponed Solar 5.6 mi 1
Solar Photovoltaic Project #17 Postponed Solar 5.7 mi 0.5
Solar Photovoltaic Project #23 Postponed Solar 5.7 mi 0.5
Solar Photovoltaic Project #18 Postponed Solar 6.0 mi 0.5
Solar Photovoltaic Project #19 Postponed Solar 6.2 mi 5
Solar Photovoltaic Project #30 Postponed Solar 8.7 mi 1.5
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 10.3 mi 4
Solar Photovoltaic Project #24 Postponed Solar 11.0 mi 4
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 11.0 mi 3
Solar Photovoltaic Project #25 Postponed Solar 11.7 mi 4.5
Solar Photovoltaic Project #27 Postponed Solar 11.8 mi 1

Sources CAISO · EIA-860M

Sources

  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution