MO33 CSG
Power plant · Solar
Key facts
Power plant · Solarran 17% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2022
- Net generation, 2025
- 2,928 MWh
- Grid
- 13 kV to Potomac Electric Power Co (PJM)
- Location
- Montgomery County, Maryland
- Operated by
- TPE MD MO33 LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 4 years since 2022
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 9,988 |
| Capacity factor, 2025 | 0.167 |
| Net generation (MWh), 2025 | 2,928 |
| Balancing authority code | PJM |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 4
- AC capacity (MW)
- 2
- DC capacity (MW)
- 2.4
- Mounting
- Single-axis tracking
- Site type
- Greenfield
- Began operating
- 2022
Source USPVDB
Source
- U.S. Large-Scale Solar Photovoltaic DatabaseMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- U.S. Large-Scale Solar Photovoltaic Database (USPVDB) — USGS and LBNL; one row per facility with its array footprintMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Montgomery County Oaks LFGE Plant Postponed | Biomass | 0.7 km | 5.6 |
| GENERAL ELECTRIC, ROCKVILLE Built | Large load | 11.3 km | |
| GE INFORMATION SYSTEMS Built | Large load | 12.8 km | |
| ADP OF WASHINGTON Built | Large load | 15.5 km | |
| VERIZON FAIRLAND DATA CENTER Built | Large load | 19.1 km | |
| PROSPERITY DRIVE DATA CENTER, LLC Built | Large load | 19.5 km | |
| GANNETT COMPANY Built | Large load | 19.9 km | |
| FANNIE MAE UTC DATA CENTER Built | Large load | 25.0 km |