Show on map
Mohave — Power plant · Coal · Southern California Edison CoArida Solar (Hybrid) — Solar + storage · NV · 370 MW · 10.7 km awayMohave Energy Park — Gas, combustion turbine · AZ · 242 MW · 24.0 km away
  • Combustion
  • Wind & solar
  • In development
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coal Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1971
Net generation, 2010
-13,158 MWh
Grid
500 kV to Southern California Edison Co (CISO)
Location
Clark County, Nevada

Output

Net generation MWh by year, 2001 to 2010
Fuel burned MMBtu by year, 2001 to 2010
  • Gas
  • Coal

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
55 years since 1971
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Edison International Corp
Share pct
56
Gem entity id
E100000001198
Name
Salt River Project
Share pct
20
Gem entity id
E100000001291
Name
Berkshire Hathaway Inc
Share pct
14
Gem entity id
E100000001155
Name
Los Angeles Department of Water & Power
Share pct
10
Gem entity id
E100000002277
Unit ids
G100000114581, G100000114582
Location id
L100000104692
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
July 2012
Capacity retired
1,636.2 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal818.1 MWRetiredJuly 2012
2Conventional Steam Coal818.1 MWRetiredJuly 2012

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
500 kV
Transmission or distribution system owner
Southern California Edison Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 25 km (4)
Connection points within 25 km (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

4 companies5
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Southern California Edison Co Operator EIA-860M
Los Angeles Department of Water & Power Owner 10.0% 31 Dec 2025 EIA-860
Nevada Power Co Owner 14.0% 31 Dec 2025 EIA-860
Salt River Project Owner 20.0% 31 Dec 2025 EIA-860
Southern California Edison Co Owner 56.0% 31 Dec 2025 EIA-860

Timeline

  • Stated Units 1, 2 scheduled to retire, 1,636.2 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Arida Solar (Hybrid) Studied Solar + storage 10.7 km 370
Mohave Energy Park Filed Gas, combustion turbine 24.0 km 242

Sources EIA-860M · CAISO

Sources

Attribution