Show on map
- Combustion
- Loads
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Loads
- Operating
- Size not stated
Moline: location and 1 exact-grade project within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Moline
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 3% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1942
- Net generation, 2025
- 20,823 MWh
- Grid
- 69 kV to MidAmerican Energy Co (MISO)
- Location
- Rock Island County, Illinois
- Operated by
- MidAmerican Energy CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 84 years since 1942
- Unused energy
- 641 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 88,862 |
| Capacity factor, 2025 | 0.031 |
| Net generation (MWh), 2025 | 20,823 |
| Balancing authority code | MISO |
Data notes (1)
- Heat rate (Btu/kWh), 2025 not shown: computed 4267.5 outside 5000-30000 Btu/kWh
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| DEERE & CO Built | Large load | 2.0 km |