Show on map
Monticello - Benton 230 kV — Transmission lineSherco LDES — Permitted · Storage · MN · 10 MW · 2.8 mi awaySherco BESS — Under construction · Storage · MN · 600 MW · 2.9 mi awayFuller Garden — Under construction · Solar · MN · 1 MW · 3.4 mi awayUNITED HEALTH GROUP NEXT TECHNOLOGY CENTER — Built · Large load · MN · 10.2 mi awayKraemer Garden — Under construction · Solar · MN · 4 MW · 10.5 mi awayEnterprise MN - Fitzthum — Under construction · Solar · MN · 1 MW · 10.5 mi awayEESolar29 — Under construction · Solar · MN · 5 MW · 11.8 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Monticello - Benton 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-MN

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
22
Substations at the ends (as the source names them)
Monticello to Benton
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID122985
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Sherco LDES Permitted Storage 2.8 mi 10
Sherco BESS Under construction Storage 2.9 mi 600
Fuller Garden Under construction Solar 3.4 mi 1
UNITED HEALTH GROUP NEXT TECHNOLOGY CENTER Built Large load 10.2 mi
Kraemer Garden Under construction Solar 10.5 mi 4
Enterprise MN - Fitzthum Under construction Solar 10.5 mi 1
EESolar29 Under construction Solar 11.8 mi 5

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution