Show on map
Monticello - Sherburne County 345 kV — Transmission lineSherco LDES — Permitted · Storage · MN · 10 MW · 0.0 mi awaySherco BESS — Under construction · Storage · MN · 600 MW · 0.1 mi awayFuller Garden — Under construction · Solar · MN · 1 MW · 7.6 mi awayUNITED HEALTH GROUP NEXT TECHNOLOGY CENTER — Built · Large load · MN · 10.1 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Monticello - Sherburne County 345 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
345 kV
States crossed
US-MN
Owner (as stated)
Northern States Power Minnesota

Details

Who’s behind it

Owner
Northern States Power Minnesota

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
6
Substations at the ends (as the source names them)
Monticello to Sherburne County
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itnorthern states power minnesota
HIFLD line ID147912
Voltage class345 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Sherco LDES Permitted Storage 0.0 mi 10
Sherco BESS Under construction Storage 0.1 mi 600
Fuller Garden Under construction Solar 7.6 mi 1
UNITED HEALTH GROUP NEXT TECHNOLOGY CENTER Built Large load 10.1 mi

Sources EIA-860M · EPA ICIS-Air

Sources

Attribution