Monticello — Power plant · Coal · Luminant Generation Company LLCMonticello unit 4 — Postponed · Coal · TX · 800 MW · 0.0 mi away
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 52% of 2017 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1974
Net generation, 2017
9,037,821 MWh
Grid
345 kV to Oncor Electric Delivery Company LLC (ERCO)
Location
Titus County, Texas

Output

Net generation MWh by year, 2001 to 2018
Fuel burned MMBtu by year, 2001 to 2018
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
52 years since 1974
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Vistra Corp
Share pct
100
Gem entity id
E100000001322
Unit ids
G100000107001, G100000107002, G100000107003
Location id
L100000104205
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000598835
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001034
Balancing authority codeERCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2018
Capacity retired
1,980 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Conventional Steam Coal593.4 MWRetiredJanuary 2018
2Conventional Steam Coal593.4 MWRetiredJanuary 2018
3Conventional Steam Coal793.2 MWRetiredJanuary 2018

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
345 kV
Transmission or distribution system owner
Oncor Electric Delivery Company LLC
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

3 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Luminant Generation Company LLC Operator EIA-860M
Vistra Energy Owner 100.0% Dec 31, 2023 EPA GHGRP
Luminant Gen Co LLC Fin Holding Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • Stated Units 1, 2, 3 scheduled to retire, 1,980 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Monticello unit 4 Postponed Coal 0.0 mi 800