Montour 138 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 138 kV
- States crossed
- US-PA
- Owner (as stated)
- Duquesne Light
Details
Who’s behind it
- Owner
- Duquesne Light
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 8
- Substations at the ends (as the source names them)
- Montour
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| Owner, as the source states it | duquesne light |
| HIFLD line ID | 124193 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| COMCAST XSDC DATA CENTER Built | Large load | 0.2 mi | |
| Emsworth BC Hydroelectric Project Announced | Hydro | 1.7 mi | 18.8 |
| EDMC DATA CENTER Built | Large load | 1.9 mi | |
| XEROX PITTSBURGH DATA CENTER Built | Large load | 2.0 mi | |
| Emsworth L&D Hydroelectric Project Announced | Hydro | 2.5 mi | 20.4 |
| Dashields Hydroelectric Project Filed | Hydro | 4.4 mi | 8.8 |
| Robinson Power Company LLC Postponed | Gas, combined cycle | 5.3 mi | 1,022.9 |
| PNC PITTSBURGH DATA CENTER Built | Large load | 8.1 mi | |
| Red Glen Energy Postponed | Gas, reciprocating engine | 12.9 mi | 22 |
| Red Glen Postponed | Gas, reciprocating engine | 13.2 mi | 22 |
Sources EPA ICIS-NPDES · EIA-860M · EPA ICIS-Air