Show on map
Moss Landing - Panoche 230 kV — Transmission lineIron BESS — Under construction · Storage · CA · 59.5 MW · 0.2 mi awayMidway BESS — Under construction · Storage · CA · 124.6 MW · 0.2 mi awayCrazy Horse Solar Project — Postponed · Solar · CA · 2 MW · 1.8 mi awayCA Moss Landing 3040 Hilltop Rd — Postponed · Solar + storage · CA · 2.2 MW · 4.0 mi awayMarina Landfill Gas — Announced · Biomass · CA · 6.4 MW · 6.1 mi awayLittle Bear Solar 2, LLC — Contracted · Solar + storage · CA · 20 MW · 10.5 mi awayEDPR CA Solar Park VI LLC (CA) Hybrid — Under construction · Solar + storage · CA · 241 MW · 11.5 mi awayEDPR Scarlet III — Under construction · Storage · CA · 70 MW · 13.2 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Moss Landing - Panoche 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA
Owner (as stated)
Pacific Gas Electric

Details

Who’s behind it

Owner
Pacific Gas Electric

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
69
Substations at the ends (as the source names them)
Moss Landing to Panoche
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpacific gas electric
HIFLD line ID308921
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Iron BESS Under construction Storage 0.2 mi 59.5
Midway BESS Under construction Storage 0.2 mi 124.6
Crazy Horse Solar Project Postponed Solar 1.8 mi 2
CA Moss Landing 3040 Hilltop Rd Postponed Solar + storage 4.0 mi 2.2
Marina Landfill Gas Announced Biomass 6.1 mi 6.4
Little Bear Solar 2, LLC Contracted Solar + storage 10.5 mi 20
EDPR CA Solar Park VI LLC (CA) Hybrid Under construction Solar + storage 11.5 mi 241
EDPR Scarlet III Under construction Storage 13.2 mi 70

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 17, 2026Source: California ISO

Attribution