Show on map
Mount Clinton — Power plant · Oil · City of Harrisonburg - (VA)ANTHEM CDC 3 — Built · Large load · VA · 1.1 km awayROCKINGHAM MEMORIAL HOSPITAL DATA CENTER — Built · Large load · VA · 5.6 km awayTwins Solar — Postponed · Solar + storage · VA · 300 MW · 6.0 km awaySun Ridge Solar — Under construction · Solar · VA · 50 MW · 20.0 km awayElkton — Postponed · Solar · VA · 2.5 MW · 20.7 km away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Mount Clinton

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1999
Net generation, 2025
1,767 MWh
Grid
23 kV to City of Harrisonburg - (VA) (PJM)
Location
Rockingham County, Virginia
Operated by
City of Harrisonburg - (VA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2003 to 2025
Fuel burned MMBtu by year, 2003 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
27 years since 1999
Unused energy
208 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
13,257 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
23
Transmission owner
City of Harrisonburg - (VA)
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 202523,425
Capacity factor, 20250.008
Heat rate (Btu/kWh), 202513,257.4
Net generation (MWh), 20251,766.9
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
ANTHEM CDC 3 Built Large load 1.1 km
ROCKINGHAM MEMORIAL HOSPITAL DATA CENTER Built Large load 5.6 km
Twins Solar Postponed Solar + storage 6.0 km 300
Sun Ridge Solar Under construction Solar 20.0 km 50
Elkton Postponed Solar 20.7 km 2.5

Sources Virginia DEQ · EPA ICIS-Air · EIA-860M

Sources

  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution