Mount Kisco Landfill Solar & Storage CSG: location and 1 exact-grade project within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Mount Kisco Landfill Solar & Storage CSG
Power plant · Solar
Key facts
Power plant · Solarran 4% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2020
- Net generation, 2025
- 638 MWh
- Grid
- 13 kV to Consolidated Edison Co-NY Inc (NYIS)
- Location
- Westchester County, New York
- Operated by
- BQ Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 6 years since 2020
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Fuel burned (MMBtu), 2025 | 2,318 |
| Capacity factor, 2025 | 0.043 |
| Net generation (MWh), 2025 | 638 |
| Balancing authority code | NYIS |
Solar arrays
Solar arrays
The array area counts panels and inverters only, not buildings, fences or the whole site.
- Array area (acres)
- 5.9
- AC capacity (MW)
- 1
- DC capacity (MW)
- 1
- Mounting
- Fixed tilt
- Site type
- Name includes "landfill" (not on EPA's landfill list)
- Began operating
- 2020
Retirement
EIA-860M September 2026StatusSome generators are scheduled to retire; most of the plant's capacity is not, so it is shown as operating. As of EIA-860M for September 2026.- Next scheduled retirement
- December 2035
- Capacity scheduled to retire
- 0.7 MW
- Generators scheduled to retire
- 1
- Share of in-service capacity scheduled
- 41%
- Capacity still in service
- 1.7 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| KISCB | Batteries | 0.7 MW | Scheduled to retire | December 2035 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 13 kV
- Transmission or distribution system owner
- Consolidated Edison Co-NY Inc
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit KISCB scheduled to retire, 0.7 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Bowline Point Postponed | Gas, combined cycle | 12.1 mi | 750 |
Sources EIA-860M