Show on map
Mount Signal Solar Farm II — Power plant · Solar · MN8 Energy LLCImperial Valley Solar, LLC — Postponed · Solar · CA · 400 MW · 2.4 mi awayBig Rock Solar Farm — Postponed · Solar · CA · 200 MW · 6.7 mi awayKingsley Solar Farm — Withdrawn · Solar + storage · CA · 299 MW · 8.0 mi awayEl Centro Hybrid — Announced · Gas, reciprocating engine · CA · 112.8 MW · 10.6 mi away
  • Combustion
  • Wind & solar
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Mount Signal Solar Farm II

Power plant · Solar

Key facts

Power plant · Solarran 30% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
402,547 MWh
Grid
230 kV to Southern California Edison Co (CISO)
Location
Imperial County, California
Operated by
MN8 Energy LLC

Output

Net generation MWh by year, 2019 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20251,373,492
Capacity factor, 20250.299
Net generation (MWh), 2025402,547
Balancing authority codeCISO

Solar arrays

Array area (acres)
1,007.1
AC capacity (MW)
153.5
DC capacity (MW)
199.6
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2020

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
MN8 Energy LLC Operator EIA-860M
Imperial Valley Solar 2, LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Imperial Valley Solar, LLC Postponed Solar 2.4 mi 400
Big Rock Solar Farm Postponed Solar 6.7 mi 200
Kingsley Solar Farm Withdrawn Solar + storage 8.0 mi 299
El Centro Hybrid Announced Gas, reciprocating engine 10.6 mi 112.8

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 18, 2026Source: California ISO

Attribution