Show on map
Muddy Run - Peach Bottom 230 kV — Transmission lineYork Energy Center — Postponed · Gas, combined cycle · PA · 120 MW · 1.9 mi awayEssential Power Rock Springs LLC — Postponed · Gas, combustion turbine · MD · 390 MW · 6.9 mi away100a Swiss Dale Farm — Under construction · Solar · MD · 2 MW · 13.9 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Muddy Run - Peach Bottom 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-PA

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
4
Substations at the ends (as the source names them)
Muddy Run to Peach Bottom
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID112131
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
York Energy Center Postponed Gas, combined cycle 1.9 mi 120
Essential Power Rock Springs LLC Postponed Gas, combustion turbine 6.9 mi 390
100a Swiss Dale Farm Under construction Solar 13.9 mi 2

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution