Multitrade of Pittsylvania LP
- Wind & solar
- Bioenergy
- In development
- Retired
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Bioenergy
- In development
- Retired
Multitrade of Pittsylvania LP: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Multitrade of Pittsylvania LP
Power plant · Biomass
Key facts
Power plant · Biomass Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1994
- Net generation, 2019
- 0 MWh
- Grid
- 115 kV to Virginia Electric & Power Co (PJM)
- Location
- Pittsylvania County, Virginia
- Operated by
- Virginia Electric & Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
- Technology
- Biomass source: “Wood/Wood Waste Biomass”
- Age
- 32 years since 1994
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Balancing authority code | PJM |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2019
- Capacity retired
- 90 MW
- Generators retired
- 2
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Wood/Wood Waste Biomass | 45 MW | Retired | March 2019 |
| GEN2 | Wood/Wood Waste Biomass | 45 MW | Retired | March 2019 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- Virginia Electric & Power Co
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- SERC
Transmission lines within 15 mi (10)
- Altavista Power Station 115 kV line
- Altavista Power Station 115 kV line
- Altavista Power Station - Altavista 115 kV
- Altavista Power Station - Altavista 115 kV
- Altavista 115 kV line
- Altavista - Smith Mountain 138 kV
- Altavista 138 kV line
- New London 138 kV line
- Otter River 115 kV line
- Candlers Mountain - Smith Mountain 138 kV
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units GEN1, GEN2 scheduled to retire, 90 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Gladys Solar LLC Announced | Solar | 7.9 mi | 60.4 |
| Pigeon Run Solar Project Announced | Solar | 12.8 mi | 60 |
Sources EIA-860M