Show on map
Municipal Power Plant — Power plant · Gas, reciprocating engine · City of Zeeland - (MI)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Municipal Power Plant

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 1% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2002
Net generation, 2025
205 MWh
Grid
12 kV to City of Zeeland - (MI) (MISO)
Location
Ottawa County, Michigan
Operated by
City of Zeeland - (MI)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
205MWh
Fuel burned, 2025
2,417MMBtu
Capacity factor, 2025
1.2%
Heat rate, 2025
11,790Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
20252052,4171.2%11,790
2024637460.4%11,841
2023566870.3%12,268
20221631,9790.9%12,141
20211491,7980.9%12,067
20201191,3160.7%11,059
20191361,5410.8%11,331
20181351,6270.8%12,052
20171121,3200.6%11,786
20161942,2581.1%11,639
2015364300.2%11,944
2014384510.2%11,868
2013586850.3%11,810
20121431,7130.8%11,979
2011346260.2%18,412
2010607980.3%13,300
2009374800.2%12,973
2008263260.1%12,538
2007617390.4%12,163
20061041,2490.6%12,010
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution