Show on map
Murray City — Power plant · Gas, reciprocating engine · City of Murray - (UT)CONDUENT DATA CENTER — Large load · UT · 5.5 mi awayDATA CENTER (200 S 200 E SLC) — Built · Large load · UT · 6.6 mi awayALIGNED DATA CENTER SLC-4 — Built · Large load · UT · 8.6 mi awayProject Sequoia- Data Center — Filed · Large load · UT · 10.2 mi awayVAST DATA CENTER — Built · Large load · UT · 10.6 mi awayKennecott Power Plant — Postponed · Gas, combined cycle · UT · 214.3 MW · 12.5 mi away
  • Combustion
  • Loads
  • In development
  • Operating
  • Retired
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Murray City

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 5% of 2001 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1948
Net generation, 2001
3,279 MWh
Grid
138 kV to City of Murray - (UT) (PACE)
Location
Salt Lake County, Utah
Operated by
City of Murray - (UT)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001
Fuel burned MMBtu by year, 2001
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
78 years since 1948
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codePACE

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
January 2002
Capacity retired
7.2 MW
Generators retired
4
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Natural Gas Internal Combustion Engine2.2 MWRetiredJanuary 2002
4Natural Gas Internal Combustion Engine1 MWRetiredJanuary 2002
5Natural Gas Internal Combustion Engine1 MWRetiredJanuary 2002
6Natural Gas Internal Combustion Engine3 MWRetiredJanuary 2002

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
City of Murray - (UT)
Balancing authority
PacifiCorp - East
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 3, 4, 5, 6 scheduled to retire, 7.2 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CONDUENT DATA CENTER Unknown Large load 5.5 mi
DATA CENTER (200 S 200 E SLC) Built Large load 6.6 mi
ALIGNED DATA CENTER SLC-4 Built Large load 8.6 mi
Project Sequoia- Data Center Filed Large load 10.2 mi
VAST DATA CENTER Built Large load 10.6 mi
Kennecott Power Plant Postponed Gas, combined cycle 12.5 mi 214.3

Sources EPA ICIS-NPDES · FAA OE/AAA · EIA-860M

Sources

Attribution