Murray City: location and 6 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Murray City
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 5% of 2001 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1948
- Net generation, 2001
- 3,279 MWh
- Grid
- 138 kV to City of Murray - (UT) (PACE)
- Location
- Salt Lake County, Utah
- Operated by
- City of Murray - (UT)SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 78 years since 1948
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | PACE |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- January 2002
- Capacity retired
- 7.2 MW
- Generators retired
- 4
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 3 | Natural Gas Internal Combustion Engine | 2.2 MW | Retired | January 2002 |
| 4 | Natural Gas Internal Combustion Engine | 1 MW | Retired | January 2002 |
| 5 | Natural Gas Internal Combustion Engine | 1 MW | Retired | January 2002 |
| 6 | Natural Gas Internal Combustion Engine | 3 MW | Retired | January 2002 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Transmission or distribution system owner
- City of Murray - (UT)
- Balancing authority
- PacifiCorp - East
- NERC region
- WECC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 3, 4, 5, 6 scheduled to retire, 7.2 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| CONDUENT DATA CENTER Unknown | Large load | 5.5 mi | |
| DATA CENTER (200 S 200 E SLC) Built | Large load | 6.6 mi | |
| ALIGNED DATA CENTER SLC-4 Built | Large load | 8.6 mi | |
| Project Sequoia- Data Center Filed | Large load | 10.2 mi | |
| VAST DATA CENTER Built | Large load | 10.6 mi | |
| Kennecott Power Plant Postponed | Gas, combined cycle | 12.5 mi | 214.3 |
Sources EPA ICIS-NPDES · FAA OE/AAA · EIA-860M