Muskingum River 138 kV line — Transmission lineBeverly L&D Hydroelectric Project — Postponed · Hydro · OH · 3 MW · 3.0 mi awayTurning Point Solar — Postponed · Solar · OH · 44 MW · 8.8 mi awayLowell L&D Hydroelectric Project — Postponed · Hydro · OH · 5 MW · 8.9 mi awayWolf Creek Solar — Postponed · Solar + storage · OH · 300 MW · 9.4 mi awayMalta L&D Hydroelectric Project — Postponed · Hydro · OH · 4 MW · 9.8 mi awayDevola L&D Hydroelectric Project — Postponed · Hydro · OH · 4 MW · 12.7 mi away
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Muskingum River 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-OH
Owner (as stated)
Ohio Power

Details

Who’s behind it

Owner
Ohio Power

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
11
Substations at the ends (as the source names them)
Muskingum River
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itohio power
HIFLD line ID109112
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Beverly L&D Hydroelectric Project Postponed Hydro 3.0 mi 3
Turning Point Solar Postponed Solar 8.8 mi 44
Lowell L&D Hydroelectric Project Postponed Hydro 8.9 mi 5
Wolf Creek Solar Postponed Solar + storage 9.4 mi 300
Malta L&D Hydroelectric Project Postponed Hydro 9.8 mi 4
Devola L&D Hydroelectric Project Postponed Hydro 12.7 mi 4

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution