Show on map
Lowell L&D Hydroelectric ProjectDevola L&D Hydroelectric Project — Postponed · Hydro · OH · 4 MW · 4.3 mi awayBeverly L&D Hydroelectric Project — Postponed · Hydro · OH · 3 MW · 7.1 mi awayWolf Creek Solar — Postponed · Solar + storage · OH · 300 MW · 11.7 mi away

Lowell L&D Hydroelectric Project

Hydro

Capacity
Capacity: sourceEIA-860M · Open licenseMW
Location
Washington County, Ohio

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Kind
Generation
Technology
Hydro source: “Conventional Hydroelectric”
Capacity (MW)
5 Capacity is the sum of the 2 generators listed under Sources.
EIA plant
62429 2 generatorsEIA generatorsPlant 62429 NA1, NA2

Timeline

  • Observed as postponed in EIA-860M (source status: “Canceled or Postponed”).

“Stated” dates are the source’s plan, not a commitment.

About these dates

Status: the most advanced any source reports, dated by that source. Later changes follow as we see them.

Sources

1 source

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Every source and license · Attribution

View at source

Report a problem

Around this project

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Devola L&D Hydroelectric Project Postponed Hydro 4.3 mi 4
Beverly L&D Hydroelectric Project Postponed Hydro 7.1 mi 3
Wolf Creek Solar Postponed Solar + storage 11.7 mi 300

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution