Show on map
Musselshell Wind Project — Power plant · Wind · Musselshell Wind Project LLC
  • Wind & solar
  • Operating
  • 10 · 100 · 1,000 MW

Musselshell Wind Project

Power plant · Wind

Key facts

Power plant · Windran 27% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
23,750 MWh
Grid
115 kV to NorthWestern Energy LLC - (MT) (NWMT)
Location
Wheatland County, Montana
Operated by
Musselshell Wind Project LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2012 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
14 years since 2012
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
115
Transmission owner
NorthWestern Energy LLC - (MT)
Balancing authority code
NWMT
Balancing authority name
NorthWestern Energy (NWMT)
Fuel burned (MMBtu), 202581,035
Capacity factor, 20250.271
Net generation (MWh), 202523,750
Balancing authority codeNWMT

Wind turbines

Turbines
7
Turbine capacity (MW)
10.5
Turbine models
7 Goldwind GW87
Hub height (m)
75
Rotor diameter (m)
87
Year online
2012

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved 25 Oct 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source