Myrtle Beach
Power plant · Oil
Key facts
Power plant · Oil Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1962
- Net generation, 2025
- -453 MWh
- Grid
- 115 kV, 34 kV to South Carolina Public Service Authority (SC)
- Location
- Horry County, South Carolina
- Operated by
- South Carolina Public Service AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 64 years since 1962
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Fuel burned (MMBtu), 2025 | 9,055 |
| Net generation (MWh), 2025 | -453.0 |
| Balancing authority code | SC |
Data notes (2)
- Capacity factor, 2025 not shown: net generation -453.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
- Heat rate (Btu/kWh), 2025 not shown: fuel burned but net generation is not positive
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- December 2033
- Capacity scheduled to retire
- 111.5 MW
- Generators scheduled to retire
- 5
- Share of in-service capacity scheduled
- 100%
- Capacity still in service
- 111.5 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Petroleum Liquids | 11.5 MW | Scheduled to retire | December 2033 |
| 2 | Petroleum Liquids | 11.5 MW | Scheduled to retire | December 2033 |
| 3 | Petroleum Liquids | 26.6 MW | Scheduled to retire | December 2033 |
| 4 | Petroleum Liquids | 26.6 MW | Scheduled to retire | December 2033 |
| 5 | Petroleum Liquids | 35.3 MW | Scheduled to retire | December 2033 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV, 34 kV
- Transmission or distribution system owner
- South Carolina Public Service Authority
- Balancing authority
- South Carolina Public Service Authority
- NERC region
- SERC
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 1, 2, 3, 4, 5 scheduled to retire, 111.5 MW · EIA-860M
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Horry Land Fill Gas Site Postponed | Oil | 7.6 mi | 21.9 |
Sources EIA-860M