Show on map
Naches — Power plant · Hydro · U.S. Dept of the Interior, Bureau of Rec
  • Clean firm
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Hydro

Key facts

Power plant · Hydro Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1909
Net generation, 2004
0 MWh
Location
Yakima County, Washington
Operated by
U.S. Dept of the Interior, Bureau of RecSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2004

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
117 years since 1909

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2003
Capacity retired
6.3 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
2Conventional Hydroelectric3 MWRetiredOctober 2003
4Conventional Hydroelectric3.3 MWRetiredOctober 2003

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 2, 4 scheduled to retire, 6.3 MW · EIA-860M