NCS FCPA LLC — Power plant · Solar · New Columbia SolarCHP Plant — Under construction · Gas, combustion turbine · DC · 5.7 MW · 4.8 mi awayMadison Solar 1 LLC — Postponed · Solar · DC · 1.2 MW · 6.1 mi awayNCBP ONE, LLC — Under construction · Solar · MD · 2.5 MW · 10.9 mi awayNCBP TEN, LLC — Under construction · Solar · MD · 1.4 MW · 11.0 mi awayNCBP Seven — Under construction · Solar · MD · 2.4 MW · 11.1 mi awayMDD109-NCBP BLDG 11-Manekin — Under construction · Solar · MD · 2.4 MW · 11.2 mi awayNCBP TWELVE, LLC — Under construction · Solar · MD · 1.2 MW · 11.2 mi awayGANNETT COMPANY — Built · Large load · MD · 11.4 mi awayPROSPERITY DRIVE DATA CENTER, LLC — Built · Large load · MD · 11.7 mi awayVERIZON FAIRLAND DATA CENTER — Built · Large load · MD · 12.4 mi awayCity of Bowie — Under construction · Solar · MD · 2 MW · 13.6 mi awayNORTHROP GRUMMAN SYSTEMS CORPORATION — Built · Large load · VA · 14.5 mi awayADP OF WASHINGTON — Built · Large load · MD · 14.5 mi awayMattawoman Energy Center — Postponed · Gas, combined cycle · MD · 1,008 MW · 14.7 mi awayZAYO GROUP, LLC — Built · Large load · VA · 14.8 mi away
  • Combustion
  • Wind & solar
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

NCS FCPA LLC

Power plant · Solar

Key facts

Power plant · Solarran 12% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2020
Net generation, 2025
1,170 MWh
Grid
21 kV to Potomac Electric Power Co (PJM)
Location
District of Columbia County, the District of Columbia
Operated by
New Columbia SolarSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
6 years since 2020
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001048697
Location id
L100001043194
Eia plant ids
68279
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
21
Transmission owner
Potomac Electric Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20253,992
Capacity factor, 20250.121
Net generation (MWh), 20251,170
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CHP Plant Under construction Gas, combustion turbine 4.8 mi 5.7
Madison Solar 1 LLC Postponed Solar 6.1 mi 1.2
NCBP ONE, LLC Under construction Solar 10.9 mi 2.5
NCBP TEN, LLC Under construction Solar 11.0 mi 1.4
NCBP Seven Under construction Solar 11.1 mi 2.4
MDD109-NCBP BLDG 11-Manekin Under construction Solar 11.2 mi 2.4
NCBP TWELVE, LLC Under construction Solar 11.2 mi 1.2
GANNETT COMPANY Built Large load 11.4 mi
PROSPERITY DRIVE DATA CENTER, LLC Built Large load 11.7 mi
VERIZON FAIRLAND DATA CENTER Built Large load 12.4 mi
City of Bowie Under construction Solar 13.6 mi 2
NORTHROP GRUMMAN SYSTEMS CORPORATION Built Large load 14.5 mi
ADP OF WASHINGTON Built Large load 14.5 mi
Mattawoman Energy Center Postponed Gas, combined cycle 14.7 mi 1,008
ZAYO GROUP, LLC Built Large load 14.8 mi

Sources EIA-860M · EPA ICIS-Air · Virginia DEQ

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • Virginia DEQOpen license · retrieved Nov 4, 2026Source: Virginia Department of Environmental Quality

Attribution