NCSU CCUP Cogeneration Plant
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 50% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2019
- Net generation, 2025
- 28,654 MWh
- Grid
- 23 kV to Duke Energy Carolinas, LLC (CPLE)
- Location
- Wake County, North Carolina
- Operated by
- NC State University, Energy SystemsSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
- Age
- 7 years since 2019
- Unused energy
- 29 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
- Heat rate
- 19,752 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 565,959 |
| Capacity factor, 2025 | 0.496 |
| Heat rate (Btu/kWh), 2025 | 19,751.5 |
| Net generation (MWh), 2025 | 28,654 |
| Balancing authority code | CPLE |
Timeline
- In service · EIA-860M
Sources
3 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| LTM1750 (Raleigh data centre) Filed | Large load | 3.1 mi | |
| HOSTED SOLUTIONS ACQUISITION - NORTH RALEIGH ** INACTIVE ** Built | Large load | 7.0 mi | |
| ACEHOST RALEIGH - DURHAM DATA CENTER Built | Large load | 12.9 mi | |
| FIDELITY REAL ESTATE CO.- FIDELITY MORRISVILLE DATA CENTER Built | Large load | 13.4 mi |
Sources FAA OE/AAA · EPA ICIS-Air