Show on map
NCSU CCUP Cogeneration Plant — Power plant · Gas, combustion turbine · NC State University, Energy SystemsLTM1750 (Raleigh data centre) — Filed · Large load · NC · 3.1 mi awayHOSTED SOLUTIONS ACQUISITION - NORTH RALEIGH ** INACTIVE ** — Built · Large load · NC · 7.0 mi awayACEHOST RALEIGH - DURHAM DATA CENTER — Built · Large load · NC · 12.9 mi awayFIDELITY REAL ESTATE CO.- FIDELITY MORRISVILLE DATA CENTER — Built · Large load · NC · 13.4 mi away
  • Combustion
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

NCSU CCUP Cogeneration Plant

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 50% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2019
Net generation, 2025
28,654 MWh
Grid
23 kV to Duke Energy Carolinas, LLC (CPLE)
Location
Wake County, North Carolina
Operated by
NC State University, Energy SystemsSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025
Fuel burned MMBtu by year, 2019 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
7 years since 2019
Unused energy
29 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
19,752 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
23
Transmission owner
Duke Energy Carolinas, LLC
Balancing authority code
CPLE
Balancing authority name
Duke Energy Progress East
Fuel burned (MMBtu), 2025565,959
Capacity factor, 20250.496
Heat rate (Btu/kWh), 202519,751.5
Net generation (MWh), 202528,654
Balancing authority codeCPLE

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
LTM1750 (Raleigh data centre) Filed Large load 3.1 mi
HOSTED SOLUTIONS ACQUISITION - NORTH RALEIGH ** INACTIVE ** Built Large load 7.0 mi
ACEHOST RALEIGH - DURHAM DATA CENTER Built Large load 12.9 mi
FIDELITY REAL ESTATE CO.- FIDELITY MORRISVILLE DATA CENTER Built Large load 13.4 mi

Sources FAA OE/AAA · EPA ICIS-Air

Sources

Attribution