Neosho — Power plant · Gas, steam turbine · Evergy Kansas South, Inc
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1954
Net generation, 2012
-529 MWh
Grid
138 kV to Kansas Gas & Electric Co (SWPP)
Location
Labette County, Kansas

Output

Net generation MWh by year, 2001 to 2013
Fuel burned MMBtu by year, 2001 to 2013
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
72 years since 1954
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110008059885
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1006736
Balancing authority codeSWPP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
June 2012
Capacity retired
69 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Natural Gas Steam Turbine69 MWRetiredJune 2012

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Transmission or distribution system owner
Kansas Gas & Electric Co
Balancing authority
Southwest Power Pool
NERC region
MRO
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Evergy Kansas South, Inc Operator EIA-860M
WESTAR ENERGY INC Owner 100.0% Dec 31, 2023 EPA GHGRP

Timeline

  • Stated Unit 3 scheduled to retire, 69 MW · EIA-860M
  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source