Show on map
New Hope — Gas processing plant · Enbridge G & P (East Texas) L.P.Monticello — Postponed · Coal · TX · 800 MW · 9.5 mi awayPine Forest Solar I — Built · Solar + storage · TX · 501.5 MW · 12.8 mi away
  • Wind & solar
  • Operating
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Gas processing plant

Key facts

Gas processing plant Operating
Location
Franklin County, Texas
Operated by
Enbridge G & P (East Texas) L.P.SourceEIA US Energy Atlas — Natural Gas Processing Plants (point geometries, operator, capacity)

Details

Who’s behind it

Owner
Enbridge G & P (East Texas) L.P.SourceEIA US Energy Atlas — Natural Gas Processing Plants (point geometries, operator, capacity)

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity (MMcf/d)
10

Capacity not stated

All 11 attributes from EIA US Energy Atlas — Natural Gas Processing Plants (point geometries, operator, capacity)
Attributes
AttributeValue
CityScroggins
Source period2017
Dry gas storage capacity0
NGL storage capacity4,000
ZIP code75163
Owner, as the source states itEnbridge G & P (East Texas) L.P.
Heat content (Btu per cubic foot)1,054
Operator, as the source states itEnbridge G & P (East Texas) L.P.
Capacity (MMcf/d)10
Source release2017_v2
Plant flow (MMcf/d)6

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Monticello Postponed Coal 9.5 mi 800
Pine Forest Solar I Built Solar + storage 12.8 mi 501.5

Sources EIA-860M · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution