Show on map
Newhalem — Power plant · Hydro · City of Seattle - (WA)
  • Clean firm
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Hydro

Key facts

Power plant · Hydro Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1970
Net generation, 2020
-85 MWh
Grid
7 kV to City of Seattle - (WA) (SCL)
Location
Whatcom County, Washington
Operated by
City of Seattle - (WA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2020

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
56 years since 1970
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
OS
Mw
2.30
Units
1
Standby mw
0
Status rule
majority_mw_retiring
In service mw
2.30
Out of service mw
2.30
Balancing authority codeSCL

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
December 2027
Capacity scheduled to retire
2.3 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
100%
Capacity still in service
2.3 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
20Conventional Hydroelectric2.3 MWScheduled to retireDecember 2027

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
7 kV
Transmission or distribution system owner
City of Seattle - (WA)
Balancing authority
Seattle City Light
NERC region
WECC
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 20 scheduled to retire, 2.3 MW · EIA-860M
  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source