Newman: location and 3 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Newman
Power plant · Gas, combined cycle
Key facts
Power plant · Gas, combined cycleran 41% of 2025 Retiring- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1960
- Net generation, 2025
- 4,003,483 MWh
- Grid
- 115 kV to El Paso Electric Co (EPE)
- Location
- El Paso County, Texas
- Operated by
- El Paso Electric CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Oil
Details
Who’s behind it
- Owner
- El Paso Electric CoSource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of 31 Dec 2023
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, combined cycle source: “Natural Gas Fired Combined Cycle”
- Age
- 66 years since 1960
- Heat rate
- 9,980 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 39,956,357 |
| Capacity factor, 2025 | 0.412 |
| Heat rate (Btu/kWh), 2025 | 9,980.4 |
| Net generation (MWh), 2025 | 4,003,483 |
| Balancing authority code | EPE |
Retirement
EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.- Next scheduled retirement
- December 2027
- Last scheduled retirement
- December 2031
- Capacity scheduled to retire
- 575 MW
- Generators scheduled to retire
- 6
- Share of in-service capacity scheduled
- 52%
- Capacity still in service
- 1,109.8 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 1 | Natural Gas Steam Turbine | 81.6 MW | Scheduled to retire | December 2027 |
| 2 | Natural Gas Steam Turbine | 81.6 MW | Scheduled to retire | December 2028 |
| 3 | Natural Gas Steam Turbine | 121.8 MW | Scheduled to retire | December 2031 |
| 4 | Natural Gas Fired Combined Cycle | 120 MW | Scheduled to retire | December 2031 |
| CT1 | Natural Gas Fired Combined Cycle | 85 MW | Scheduled to retire | December 2031 |
| CT2 | Natural Gas Fired Combined Cycle | 85 MW | Scheduled to retire | December 2031 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Natural Gas Fired Combined Cycle | 290 MW | |
| Natural Gas Steam Turbine | 285 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 115 kV
- Transmission or distribution system owner
- El Paso Electric Co
- Balancing authority
- El Paso Electric Company
- NERC region
- WECC
Transmission lines within 25 km (10)
- 115 kV line (OSM way 1286925956)
- 115 kV line (OSM way 1286925959)
- 115 kV line (OSM way 1286925958)
- 115 kV line (OSM way 1286925955)
- 115 kV line (OSM way 1286926342)
- 115 kV line (OSM way 1286925954)
- 115 kV line (OSM way 1286926341)
- 115 kV line (OSM way 1286925957)
- 115 kV line (OSM way 1286925953)
- 115 kV line (OSM way 1286925952)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units 3, 4, CT1, CT2 scheduled to retire, 411.8 MW · EIA-860M
- Stated Unit 2 scheduled to retire, 81.6 MW · EIA-860M
- Stated Unit 1 scheduled to retire, 81.6 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
© OpenStreetMap contributors
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Newman Buffer Filed | Solar | 0.9 km | 102.2 |
| IBOS - Seafox El Paso (El Paso data centre) Filed | Large load | 4.9 km | |
| Buena Vista Energy Center III Under construction | Solar + storage | 16.6 km | 200 |