Show on map
North 115 kV line — Transmission lineCSC-A — Built · Large load · NM · 0.5 mi awayOSO GRANDE TECHNOLOGY — Filed · Large load · NM · 4.3 mi awayALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER — Built · Large load · NM · 4.9 mi awayPRESBYTERIAN HEALTHCARE INFO SYS CTR — Built · Large load · NM · 5.9 mi awayOso Negro — Permitted · Storage · NM · 100 MW · 6.9 mi awayCNM WESTSIDE DATA CENTER — Filed · Large load · NM · 7.5 mi awayWESTPOINTE DATA CENTER — Built · Large load · NM · 8.6 mi awayCorazon Energy Storage — Under construction · Storage · NM · 150 MW · 12.2 mi awaySLO-2 — Under construction · Solar · NM · 5 MW · 13.3 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

North 115 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
115 kV
States crossed
US-NM
Owner (as stated)
Public Service Of New Mexico

Details

Who’s behind it

Owner
Public Service Of New Mexico

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
2
Substations at the ends (as the source names them)
North
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itpublic service of new mexico
HIFLD line ID310406
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CSC-A Built Large load 0.5 mi
OSO GRANDE TECHNOLOGY Filed Large load 4.3 mi
ALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER Built Large load 4.9 mi
PRESBYTERIAN HEALTHCARE INFO SYS CTR Built Large load 5.9 mi
Oso Negro Permitted Storage 6.9 mi 100
CNM WESTSIDE DATA CENTER Filed Large load 7.5 mi
WESTPOINTE DATA CENTER Built Large load 8.6 mi
Corazon Energy Storage Under construction Storage 12.2 mi 150
SLO-2 Under construction Solar 13.3 mi 5

Sources EPA ICIS-Air · EIA-860M · EPA ICIS-NPDES · Berkeley Lab

Sources

  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026
  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Attribution