Show on map
North Madison - Vienna 138 kV — Transmission lineVienna Walbec Customer Hosted — Under construction · Solar · WI · 1.4 MW · 2.4 mi awayHigh Noon Solar Energy LLC — Under construction · Solar · WI · 300 MW · 6.8 mi awayUW Madison Charter Street Plant — Postponed · Biomass · WI · 22 MW · 10.5 mi awayNine Springs Solar — Under construction · Solar · WI · 8 MW · 13.2 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

North Madison - Vienna 138 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-WI
Owner (as stated)
American Transmission

Details

Who’s behind it

Owner
American Transmission

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
4
Substations at the ends (as the source names them)
North Madison to Vienna
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itamerican transmission
HIFLD line ID143840
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Vienna Walbec Customer Hosted Under construction Solar 2.4 mi 1.4
High Noon Solar Energy LLC Under construction Solar 6.8 mi 300
UW Madison Charter Street Plant Postponed Biomass 10.5 mi 22
Nine Springs Solar Under construction Solar 13.2 mi 8

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution