Show on map
North Main — Power plant · Gas, steam turbine · Luminant Generation Company LLCCyrusOne DFW 7 — Large load · TX · 16.3 km awayACS DFW Hicks Field Rd (Fort Worth data centre) — Large load · TX · 17.5 km awayFort Watt Storage — Storage · TX · 200 MW · 18.2 km awayEagle Mountain — Gas, combined cycle · TX · 853.5 MW · 20.9 km away
  • Combustion
  • Loads
  • In development
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1952
Net generation, 2004
0 MWh
Grid
138 kV (ERCO)
Location
Tarrant County, Texas
Operated by
Luminant Generation Company LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2004
Fuel burned MMBtu by year, 2001 to 2004
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
74 years since 1952
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeERCO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
March 2004
Capacity retired
81.2 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
4Natural Gas Steam Turbine81.2 MWRetiredMarch 2004

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
138 kV
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 4 scheduled to retire, 81.2 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

© OpenStreetMap contributors

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
CyrusOne DFW 7 Filed Large load 16.3 km
ACS DFW Hicks Field Rd (Fort Worth data centre) Filed Large load 17.5 km
Fort Watt Storage Postponed Storage 18.2 km 200
Eagle Mountain Postponed Gas, combined cycle 20.9 km 853.5