North Main
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbine Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1952
- Net generation, 2004
- 0 MWh
- Grid
- 138 kV (ERCO)
- Location
- Tarrant County, Texas
- Operated by
- Luminant Generation Company LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 74 years since 1952
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | ERCO |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2004
- Capacity retired
- 81.2 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 4 | Natural Gas Steam Turbine | 81.2 MW | Retired | March 2004 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 138 kV
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
Transmission lines within 25 km (10)
- 138 kV line (OSM way 340879825)
- 138 kV line (OSM way 340879734)
- Oncor 138 kV line (OSM way 340991791)
- 138 kV line (OSM way 1354311498)
- 138 kV line (OSM way 1354311502)
- 138 kV line (OSM way 1354311500)
- 138 kV line (OSM way 749014142)
- 138 kV line (OSM way 1354311501)
- 138 kV line (OSM way 1354311499)
- 138 kV line (OSM way 1354311503)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit 4 scheduled to retire, 81.2 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| CyrusOne DFW 7 Filed | Large load | 16.3 km | |
| ACS DFW Hicks Field Rd (Fort Worth data centre) Filed | Large load | 17.5 km | |
| Fort Watt Storage Postponed | Storage | 18.2 km | 200 |
| Eagle Mountain Postponed | Gas, combined cycle | 20.9 km | 853.5 |