North Riley
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 19% of 2005 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1990
- Net generation, 2005
- 4,983 MWh
- Location
- Gaines County, Texas
- Operated by
- Pure ResourcesSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
- Age
- 36 years since 1990
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- September 2005
- Capacity retired
- 3 MW
- Generators retired
- 3
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN1 | Natural Gas Internal Combustion Engine | 1 MW | Retired | September 2005 |
| GEN2 | Natural Gas Internal Combustion Engine | 1 MW | Retired | September 2005 |
| GEN3 | Natural Gas Internal Combustion Engine | 1 MW | Retired | September 2005 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
- 69 kV line (OSM way 360447665)
- 69 kV line (OSM way 360447661)
- 69 kV line (OSM way 360447660)
- 115 kV line (OSM way 20874899)
- 115 kV line (OSM way 1562641231)
- 115 kV line (OSM way 1562641232)
- 115 kV line (OSM way 360447659)
- 69 kV line (OSM way 1127927726)
- 115 kV line (OSM way 1127927727)
- 115 kV line (OSM way 1344907297)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Units GEN1, GEN2, GEN3 scheduled to retire, 3 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · OpenStreetMap · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
© OpenStreetMap contributors
Sources
- EIA-860M
- OpenStreetMap© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Gaines County Postponed | Gas, combustion turbine | 13.3 mi | 225 |
Sources EIA-860M