Show on map
Northern Orchard Solar PV, LLC — Power plant · Solar · RWE Americas, LLCMaricopa West Solar 2 — Withdrawn · Solar · CA · 20 MW · 2.6 mi awayJasmine — Under construction · Solar + storage · CA · 70 MW · 9.2 mi awayMaricopa East Solar — Withdrawn · Solar · CA · 18 MW · 10.9 mi awayHydrogen Energy California LLC — Withdrawn · Coal · CA · 421 MW · 14.7 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Northern Orchard Solar PV, LLC

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
230 kV to Pacific Gas & Electric Co. (CISO)
Location
Kern County, California
Operated by
RWE Americas, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
1 year since 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019507
Location id
L100001017520
Eia plant ids
67039
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
Pacific Gas & Electric Co.
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 2025719,491
Capacity factor, 20250.098
Net generation (MWh), 2025207,796
Balancing authority codeCISO

Solar arrays

Array area (acres)
846.7
AC capacity (MW)
150
DC capacity (MW)
150
Site type
Greenfield
Began operating
2025

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Maricopa West Solar 2 Withdrawn Solar 2.6 mi 20
Jasmine Under construction Solar + storage 9.2 mi 70
Maricopa East Solar Withdrawn Solar 10.9 mi 18
Hydrogen Energy California LLC Withdrawn Coal 14.7 mi 421

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 17, 2026Source: California ISO

Attribution