Show on map
Northwest Community Hospital — Power plant · Gas, reciprocating engine · Northwest Community HospitalADP — Built · Large load · IL · 2.4 mi awayAligned Data Centers ORD04 — Under construction · Large load · IL · 2.4 mi awayTUR VENTURES LLC — Built · Large load · IL · 3.1 mi awayCloud HQ- ORD — Filed · Large load · IL · 3.2 mi awayCHI12 Data Center — Filed · Large load · IL · 3.2 mi awayELK GROVE VILLAGE (CHI10-11-12) DATA CENTER — Large load · IL · 3.2 mi awayT5@CHICAGO II LP — Built · Large load · IL · 3.2 mi awayCLOUD HQ DATA CENTER — Built · Large load · IL · 3.2 mi awayPrime Data Center — Built · Large load · IL · 3.5 mi awayEDGECONNEX — Built · Large load · IL · 4.1 mi awayData Center 901 Busse Road Elk Grove — Filed · Large load · IL · 4.3 mi awayElk Grove 1-SLCHI701 — Under construction · Solar · IL · 1.7 MW · 4.4 mi awaySTREAM DATA CENTERS ORDC CAMPUS — Built · Large load · IL · 4.5 mi awayElk Grove 51-SLCHI151 — Under construction · Solar · IL · 1.4 MW · 5.0 mi awaySTREAM DATA CENTERS — Built · Large load · IL · 5.0 mi awayEquinix CH5 Chiller — Built · Large load · IL · 5.0 mi awayEQUINIX CH-5 DATA CENTER — Built · Large load · IL · 5.0 mi awayEDGECONNEX — Large load · IL · 5.1 mi awayELK GROVE DATA CENTER LLC — Large load · IL · 5.2 mi awayDIPPER VENTURES LLC CH3 DATA CENTER — Built · Large load · IL · 5.3 mi awayELK GROVE VILLAGE (CH1-CH2-CH3) DATA CENTER — Built · Large load · IL · 5.3 mi awayDes Plaines 11-SLCHI211 — Under construction · Solar · IL · 1.6 MW · 5.4 mi away2425 BUSSE ROAD LLC — Built · Large load · IL · 5.5 mi awayMobile Crane - Unit (Chicago data centre) — Filed · Large load · IL · 5.6 mi awayNTT Data Centers — Built · Large load · IL · 5.6 mi awayBensenville 13-SLCHI513 — Under construction · Solar · IL · 1.4 MW · 5.9 mi awayBensenville Ind Park 12-SLCHI412 — Postponed · Solar · IL · 1.1 MW · 5.9 mi awayBensenville Ind Park 2-SLCHI402 — Under construction · Solar · IL · 1.1 MW · 6.1 mi awayBensenville Ind Park 11 — Under construction · Solar · IL · 1.2 MW · 6.2 mi awayBensenville Ind Park 4-SLCHI424 — Under construction · Solar · IL · 1.7 MW · 6.2 mi awayBensenville Ind Park 6-SLCHI406 — Postponed · Solar · IL · 1.1 MW · 6.2 mi awayBensenville Ind Park 10-SLCHI410 — Under construction · Solar · IL · 1.2 MW · 6.2 mi awayBensenville 14-SLCHI414 — Under construction · Solar · IL · 1.3 MW · 6.4 mi awayCHICAGO ENTERPRISE LLC — Built · Large load · IL · 6.5 mi awayCyrus One V3 Point 1 — Under construction · Large load · IL · 6.5 mi awayBensenville 2-SLCHI526 — Under construction · Solar · IL · 1.9 MW · 7.0 mi awayMICROSOFT HOFFMAN ESTATES (CHI05) DATA CENTER — Large load · IL · 7.2 mi awayMelrose Park 2-SLCHI547 — Under construction · Solar · IL · 3 MW · 9.0 mi awayCopenhagen Ct — Under construction · Solar · IL · 3.5 MW · 9.7 mi awayAddison 11-SLCHI404 — Under construction · Solar · IL · 1.6 MW · 9.9 mi awayT5 Data Center Northlake — Filed · Large load · IL · 10.0 mi awayT5@CHICAGO III LP — Built · Large load · IL · 10.1 mi awayGlendale Heights 10-SLCHI910 — Under construction · Solar · IL · 1.3 MW · 10.3 mi awayNorthlake 5-SLCHI305 — Under construction · Solar · IL · 2.5 MW · 10.4 mi awayMICROSOFT CORP-CHICAGO DATA CENTER — Built · Large load · IL · 10.4 mi awayNorthlake 4-SLCHI304 — Under construction · Solar · IL · 1.4 MW · 10.8 mi awayFranklin Park 2-SLCHI802 — Under construction · Solar · IL · 1.2 MW · 10.8 mi awayNALCO WATER — Built · Large load · IL · 11.0 mi awayNorthlake 3-SLCHI303 — Under construction · Solar · IL · 1.6 MW · 11.2 mi awayAligned (Northlake data centre) — Built · Large load · IL · 11.3 mi away
  • Combustion
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • 10 · 100 · 1,000 MW

Northwest Community Hospital

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 2% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1996
Net generation, 2025
587 MWh
Grid
12 kV to Commonwealth Edison Co (PJM)
Location
Cook County, Illinois
Operated by
Northwest Community HospitalSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2025
Fuel burned MMBtu by year, 2014 to 2025
  • Gas

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
30 years since 1996
Unused energy
38 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
10,879 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
12.50
Transmission owner
Commonwealth Edison Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 20256,386
Capacity factor, 20250.015
Heat rate (Btu/kWh), 202510,879
Net generation (MWh), 2025587
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
ADP Built Large load 2.4 mi
Aligned Data Centers ORD04 Under construction Large load 2.4 mi
TUR VENTURES LLC Built Large load 3.1 mi
Cloud HQ- ORD Filed Large load 3.2 mi
CHI12 Data Center Filed Large load 3.2 mi
ELK GROVE VILLAGE (CHI10-11-12) DATA CENTER Unknown Large load 3.2 mi
T5@CHICAGO II LP Built Large load 3.2 mi
CLOUD HQ DATA CENTER Built Large load 3.2 mi
Prime Data Center Built Large load 3.5 mi
EDGECONNEX × 2 units Built Large load 4.1 mi
Data Center 901 Busse Road Elk Grove Filed Large load 4.3 mi
Elk Grove 1-SLCHI701 Under construction Solar 4.4 mi 1.7
STREAM DATA CENTERS ORDC CAMPUS Built Large load 4.5 mi
Elk Grove 51-SLCHI151 Under construction Solar 5.0 mi 1.4
STREAM DATA CENTERS Built Large load 5.0 mi
Equinix CH5 Chiller Built Large load 5.0 mi
EQUINIX CH-5 DATA CENTER Built Large load 5.0 mi
ELK GROVE DATA CENTER LLC Unknown Large load 5.2 mi
DIPPER VENTURES LLC CH3 DATA CENTER Built Large load 5.3 mi
ELK GROVE VILLAGE (CH1-CH2-CH3) DATA CENTER Built Large load 5.3 mi
Des Plaines 11-SLCHI211 Under construction Solar 5.4 mi 1.6
2425 BUSSE ROAD LLC Built Large load 5.5 mi
Mobile Crane - Unit (Chicago data centre) Filed Large load 5.6 mi
NTT Data Centers Built Large load 5.6 mi
Bensenville 13-SLCHI513 Under construction Solar 5.9 mi 1.4
Bensenville Ind Park 12-SLCHI412 Postponed Solar 5.9 mi 1.1
Bensenville Ind Park 2-SLCHI402 Under construction Solar 6.1 mi 1.1
Bensenville Ind Park 11 Under construction Solar 6.2 mi 1.2
Bensenville Ind Park 4-SLCHI424 Under construction Solar 6.2 mi 1.7
Bensenville Ind Park 6-SLCHI406 Postponed Solar 6.2 mi 1.1
Bensenville Ind Park 10-SLCHI410 Under construction Solar 6.2 mi 1.2
Bensenville 14-SLCHI414 Under construction Solar 6.4 mi 1.3
CHICAGO ENTERPRISE LLC Built Large load 6.5 mi
Cyrus One V3 Point 1 Under construction Large load 6.5 mi
Bensenville 2-SLCHI526 Under construction Solar 7.0 mi 1.9
MICROSOFT HOFFMAN ESTATES (CHI05) DATA CENTER Unknown Large load 7.2 mi
Melrose Park 2-SLCHI547 Under construction Solar 9.0 mi 3
Copenhagen Ct Under construction Solar 9.7 mi 3.5
Addison 11-SLCHI404 Under construction Solar 9.9 mi 1.6
T5 Data Center Northlake Filed Large load 10.0 mi
T5@CHICAGO III LP Built Large load 10.1 mi
Glendale Heights 10-SLCHI910 Under construction Solar 10.3 mi 1.3
Northlake 5-SLCHI305 Under construction Solar 10.4 mi 2.5
MICROSOFT CORP-CHICAGO DATA CENTER Built Large load 10.4 mi
Northlake 4-SLCHI304 Under construction Solar 10.8 mi 1.4
Franklin Park 2-SLCHI802 Under construction Solar 10.8 mi 1.2
NALCO WATER Built Large load 11.0 mi
Northlake 3-SLCHI303 Under construction Solar 11.2 mi 1.6
Aligned (Northlake data centre) Built Large load 11.3 mi

Sources EPA ICIS-Air · EPA ICIS-NPDES · FAA OE/AAA · EIA-860M

Sources

Attribution