Show on map
Notus Wind 1 — Power plant · Wind · Notus Clean Energy LLCCanal — Postponed · Gas, combustion turbine · MA · 330 MW · 12.3 mi awayMartha's Vineyard Community Battery — Postponed · Storage · MA · 4.9 MW · 12.6 mi awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 12.7 mi awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 12.9 mi away
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Notus Wind 1

Power plant · Wind

Key facts

Power plant · Windran 34% of 2025 Retiring
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2010
Net generation, 2025
5,031 MWh
Grid
25 kV to NSTAR Electric Company (ISNE)
Location
Barnstable County, Massachusetts
Operated by
Notus Clean Energy LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2010 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
16 years since 2010
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019736
Location id
L100001017747
Eia plant ids
57414
Fuel burned (MMBtu), 202517,166
Capacity factor, 20250.338
Net generation (MWh), 20255,031
Balancing authority codeISNE

Wind turbines

Turbines
1
Turbine capacity (MW)
1.6
Turbine models
1 Vestas V82-1.65
Hub height (m)
80
Rotor diameter (m)
82
Year online
2010

Source U.S. Wind Turbine Database

Source

  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb

Attribution

Retirement

EIA-860M September 2026StatusAt least half of the plant's in-service nameplate capacity is scheduled to retire, on dates its owner has reported to EIA. As of EIA-860M for September 2026.
Next scheduled retirement
July 2035
Capacity scheduled to retire
1.7 MW
Generators scheduled to retire
1
Share of in-service capacity scheduled
100%
Capacity still in service
1.7 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
1Onshore Wind Turbine1.7 MWScheduled to retireJuly 2035

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
25 kV
Transmission or distribution system owner
NSTAR Electric Company
Balancing authority
ISO New England Inc.
NERC region
NPCC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit 1 scheduled to retire, 1.7 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · U.S. Wind Turbine Database · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • U.S. Wind Turbine DatabaseOpen license · retrieved Oct 25, 2026Map services and data are available from U.S. Wind Turbine Database, provided by the U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uswtdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Canal Postponed Gas, combustion turbine 12.3 mi 330
Martha's Vineyard Community Battery Postponed Storage 12.6 mi 4.9
Randall Lane Solar Under construction Solar + storage 12.7 mi 10
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 12.9 mi 4.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution