Oakely — Power plant · Gas, reciprocating engine · City of Oakley
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engine Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1948
Net generation, 2012
0 MWh
Location
LOGAN County, Kansas
Operated by
City of OakleySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2002 to 2012
Fuel burned MMBtu by year, 2002 to 2012
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
78 years since 1948

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
April 2011
First unit retired
January 2009
Capacity retired
8 MW
Generators retired
6
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Natural Gas Internal Combustion Engine0.5 MWRetiredJanuary 2009
5Natural Gas Internal Combustion Engine1.5 MWRetiredJanuary 2009
1Natural Gas Internal Combustion Engine1.4 MWRetiredApril 2011
2Petroleum Liquids0.4 MWRetiredApril 2011
4Natural Gas Internal Combustion Engine0.9 MWRetiredApril 2011
6Natural Gas Internal Combustion Engine3.3 MWRetiredApril 2011
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Natural Gas Internal Combustion Engine7.6 MW
Petroleum Liquids0.4 MW

Grid

Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2, 4, 6 scheduled to retire, 6 MW · EIA-860M
  • Stated Units 3, 5 scheduled to retire, 2 MW · EIA-860M
  • In service · EIA-860M