Ocoee 3: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Ocoee 3
Power plant · Hydro
Key facts
Power plant · Hydroran 56% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1943
- Net generation, 2025
- 141,310 MWh
- Grid
- 161 kV to Tennessee Valley Authority (TVA)
- Location
- Polk County, Tennessee
- Operated by
- Tennessee Valley AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 141,310
MWh - Fuel burned, 2025
- 482,149
MMBtu - Capacity factor, 2025
- 56.0
% - Heat rate, 2025
- Not stated
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 141,310 | 482,149 | 56.0% | — |
| 2024 | 151,739 | 517,734 | 60.0% | — |
| 2023 | 141,416 | 482,512 | 56.0% | — |
| 2022 | 165,751 | 565,542 | 65.7% | — |
| 2021 | 211,092 | 1,866,899 | 83.7% | — |
| 2020 | 235,191 | 2,061,918 | 93.0% | — |
| 2019 | 148,020 | 1,318,118 | 58.7% | — |
| 2018 | 193,684 | 1,763,298 | 76.8% | — |
| 2017 | 118,583 | 1,092,505 | 47.0% | — |
| 2016 | 120,050 | 1,108,303 | 47.4% | — |
| 2015 | 176,642 | 1,646,126 | 70.0% | — |
| 2014 | 152,648 | 1,451,682 | 60.5% | — |
| 2013 | 201,531 | 1,922,806 | 79.9% | — |
| 2012 | 109,209 | 1,039,235 | 43.2% | — |
| 2011 | 93,685 | 910,243 | 37.1% | — |
| 2010 | 157,172 | 1,533,372 | 62.3% | — |
| 2009 | 158,793 | 1,549,819 | 62.9% | — |
| 2008 | 64,623 | 636,795 | 25.5% | — |
| 2007 | 75,449 | 745,737 | 29.9% | — |
| 2006 | 126,100 | 1,250,785 | 50.0% | — |
| 2005 | 190,339 | 1,903,200 | 75.4% | — |
| 2004 | 98,567 | 987,838 | 39.0% | — |
| 2003 | 208,823 | 2,138,556 | 82.8% | — |
| 2002 | 125,755 | 1,279,306 | 49.9% | — |
| 2001 | 111,900 | 1,156,263 | 44.4% | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.
Sources
2 sourcesSources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)