Show on map
Odessa — Power plant · Oil · City of Odessa - (MO)
  • Combustion
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1939
Net generation, 2015
0 MWh
Location
Lafayette County, Missouri
Operated by
City of Odessa - (MO)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2015
Fuel burned MMBtu by year, 2001 to 2015
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
87 years since 1939
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeSWPP

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
April 2015
First unit retired
January 2008
Capacity retired
7.3 MW
Generators retired
5
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
5Petroleum Liquids1.2 MWRetiredJanuary 2008
2Petroleum Liquids0.2 MWRetiredMarch 2011
3Petroleum Liquids2 MWRetiredApril 2015
6Petroleum Liquids3 MWRetiredApril 2015
IC4Petroleum Liquids0.9 MWRetiredApril 2015

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
SWPP
Transmission lines within 25 km (3)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 3, 6, IC4 scheduled to retire, 5.9 MW · EIA-860M
  • Stated Unit 2 scheduled to retire, 0.2 MW · EIA-860M
  • Stated Unit 5 scheduled to retire, 1.2 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source