Show on map
Ohara 230 kV line — Transmission lineDC-1 (Hampton data centre) — Filed · Large load · GA · 6.8 mi awayQTS DC11 Data Center — Filed · Large load · GA · 8.5 mi awayQTS DC4 Data Center — Filed · Large load · GA · 9.4 mi awayFT GIllem MASE Crane (Forest Park data centre) — Filed · Large load · GA · 10.1 mi awayTA Reality Ellenwood Data Center — Filed · Large load · GA · 10.9 mi awayDeKalb County Green Energy Facility — Postponed · Biomass · GA · 1.6 MW · 12.5 mi awayVantage Data Centers GA1, LLC — Under construction · Large load · GA · 12.6 mi awayATL06 DATA CENTER — Under construction · Large load · GA · 13.8 mi awayEDGECONNEX ATL11, LLC — Filed · Large load · GA · 14.7 mi away
  • Loads
  • In development
  • Under construction
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Ohara 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-GA
Owner (as stated)
Georgia Power

Details

Who’s behind it

Owner
Georgia Power

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
4
Substations at the ends (as the source names them)
Ohara
All 3 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
Owner, as the source states itgeorgia power
HIFLD line ID150644
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
DC-1 (Hampton data centre) Filed Large load 6.8 mi
QTS DC11 Data Center Filed Large load 8.5 mi
QTS DC4 Data Center Filed Large load 9.4 mi
FT GIllem MASE Crane (Forest Park data centre) Filed Large load 10.1 mi
TA Reality Ellenwood Data Center Filed Large load 10.9 mi
DeKalb County Green Energy Facility Postponed Biomass 12.5 mi 1.6
Vantage Data Centers GA1, LLC Under construction Large load 12.6 mi
ATL06 DATA CENTER Under construction Large load 13.8 mi
EDGECONNEX ATL11, LLC Filed Large load 14.7 mi

Sources FAA OE/AAA · EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · Georgia EPD

Sources

  • FAA OE/AAAOpen license · retrieved Nov 13, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 8, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • Georgia EPDOpen license, with credit · retrieved Nov 13, 2026Source: Georgia Environmental Protection Division, Air Protection Branch

Attribution